Our projects

Projects done

Satisfied Customers

240+

200+

The bored piling work at Nolimit Wattala was a key component of the foundation construction, ensuring stability for the retail complex. The project involved drilling deep into a site with challenging sandy and clayey soils, requiring precise techniques to secure the structure. Using advanced rotary drilling rigs, piles were installed with careful attention to borehole stabilization through temporary casing. The concrete was placed using the tremie method to maintain quality and structural integrity. Rigorous load testing confirmed the piles' ability to support the building, ensuring long-term durability and safety for the Nolimit Wattala structure.

Nolimit Wattala

The bored piling work at Hemas Hospital in Wattala was a crucial element in establishing a solid foundation for the healthcare facility. The project involved drilling deep into the ground, where variable soil conditions, including soft clay and dense sand, required specialized techniques for stability. Advanced rotary drilling rigs were used to install the piles, with temporary casings employed to stabilize it. High-strength concrete was placed using the tremie method to ensure consistency and durability. Comprehensive load testing was conducted to verify that the piles could support the hospital's structure, ensuring long-term stability and safety for the facility.

Hemas Hospital Wattala

The micro piling work for Medi Health Horana was essential in providing a strong foundation for the healthcare facility. The project involved drilling deep into the site, characterized by varying soil conditions, to ensure stability for the new building. Advanced drilling techniques were used, with temporary casings employed to maintain integrity during the drilling process. Concrete was placed using the tremie method to ensure uniform quality and strength of the piles. Rigorous load testing confirmed that the piles met the necessary specifications, ensuring the structural stability and longevity of Medi Health Horana.

Medi Health Horana

Nawaloka Hospital Nawam Mawatha

We completed essential piling work at Nawaloka Hospital on Nawam Mawatha, Sri Lanka, supporting the hospital’s expansion. The team installed deep foundation systems to ensure a stable base for the multi-story structure. With advanced techniques and precision, We successfully met engineering requirements and project timelines, providing a reliable foundation for the hospital's development.

Ramsay Garden Apartment Complex

Located in Colombo 5, Ramsay Garden is a luxury residential project built to withstand the area’s challenging conditions. Monsoon rains and high humidity were countered with advanced drainage and corrosion-resistant materials. The soft, unstable soil required deep piling and ground stabilization by us to ensure a strong foundation. A high water table risk was mitigated with elevated piles and waterproofing. Additionally, strict security measures prevented material theft during construction. Through expert engineering, Ramsay Garden now stands as a durable, high-end apartment complex, overcoming environmental and logistical obstacles to offer modern, secure living in Colombo’s prime urban hub.

Dynasty Residence Kandy

Perched in Kandy’s scenic hills, Dynasty Residence faced uneven terrain and loose soil, requiring bored pile foundations for stability. We drilled deep into firm strata to support the structure, overcoming slope instability and monsoon erosion risks. Advanced techniques ensured load-bearing safety, while waterproofing guarded against Kandy’s heavy rains. The result? A luxury hillside residence with a rock-solid foundation, blending modern living with Kandy’s natural beauty.

Yoke Building Colombo 5

We undertook the low headroom piling work for the Yoke Building in Colombo 5, overcoming significant space constraints in the urban environment. Due to the limited overhead clearance, specialized equipment was used to install piles efficiently while minimizing disruption to surrounding structures. One major challenge was maneuvering heavy machinery in tight spaces without compromising safety. Additionally, dealing with groundwater infiltration required advanced dewatering techniques to maintain stability during excavation. Despite these hurdles, We successfully completed the foundation work, ensuring a strong structural base for the Yoke Building’s development in a densely built-up area

Lanka Volatile Factory

We carried out the low headroom piling work for the Lanka Volatile Factory in Kandy, tackling challenges posed by limited access and the uneven terrain of the site. Specialized equipment was deployed to ensure precise pile installation despite the restricted working space. One key challenge was navigating tight site conditions, requiring careful coordination to avoid disruptions to nearby structures. Additionally, the area's variable soil conditions necessitated advanced soil stabilization techniques to maintain structural integrity. Through expert planning and execution, We successfully completed the foundation work, providing a strong base for the factory’s development.

Kurunegala Hospital Maternity Ward

Executing the precast piling work for the Kurunegala Hospital Maternity Ward, ensuring a stable foundation for the critical healthcare facility. The project required precision and efficiency to minimize disruptions to hospital operations. One major challenge was working in an active hospital environment, demanding strict safety protocols and noise control measures. Additionally, variable soil conditions required careful pile selection and installation to ensure long-term stability. Despite these challenges, We successfully completed the foundation work, supporting the expansion of essential maternal healthcare services in the region.